RP STADIUM DR TO I over CST RAYTOWN RD
Map
Coordinates:
+39.05162, -94.4985939°03'06" N, 94°29'55" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | RP STADIUM DR TO I over CST RAYTOWN RD |
| Structure number: | 2459 |
| Old structure number: | A2853 2 (from 1992 edition) |
| Location: | S 24 T 49 N R 33 W |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 77.1 ft. [23.5 m] |
| Total length: | 182.1 ft. [55.5 m] |
| Roadway width between curbs: | 38.1 ft. [11.6 m] |
| Deck width edge-to-edge: | 40.7 ft. [12.4 m] |
| Vertical clearance below bridge: | 23.0 ft. [7.0 m] |
| Skew angle: | 22° |
| Owner: | State Highway Agency [01] |
| Year built: | 1972 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 4,701 [as of 2009] |
| Truck traffic: | 18% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 52.8 tons [48.0 metric tons] |
| Inventory rating: | 35.2 tons [32.0 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 95.2 |
2000 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 4,382 [as of 1997] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 59.4 tons [54.0 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 94.4 |
1992 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 3,040 [as of 1990] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 59.4 tons [54.0 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 95.5 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $564,000 |