Share:

OSPREY ST over TRIB OF WINN BR

Map 

Coordinates:
+39.72136, -92.34137
39°43'17" N, 92°20'29" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:OSPREY ST over TRIB OF WINN BR
Structure number:24810
Old structure number:5560005 061 (from 1992 edition)
Location:S 22 T 57 N R 13 W
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:25.9 ft. [7.9 m]
Total length:26.9 ft. [8.2 m]
Roadway width between curbs:17.4 ft. [5.3 m]
Deck width edge-to-edge:18.0 ft. [5.5 m]
Owner:County Highway Agency [02]
Year built:1994
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:30 [as of 2008]
Truck traffic:10% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:82.2 tons [74.7 metric tons]
Inventory rating:49.5 tons [45.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:96.0

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:30 [as of 1998]
Truck traffic:10% of total traffic
Deck condition:Excellent [9 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Excellent [9 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:82.2 tons [74.7 metric tons]
Inventory rating:49.5 tons [45.0 metric tons]
Sufficiency rating:96.0