Share:

PLEASANT VALLY RD over BIG SHOAL CR

Map 

Coordinates:
+39.21404, -94.51573
39°12'51" N, 94°30'57" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:PLEASANT VALLY RD over BIG SHOAL CR
Structure number:25331
Old structure number:N101B41 024 (from 1992 edition)
Location:S 20 T 51 N R 32 W
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:74.2 ft. [22.6 m]
Total length:180.1 ft. [54.9 m]
Roadway width between curbs:27.9 ft. [8.5 m]
Deck width edge-to-edge:36.1 ft. [11.0 m]
Owner:City or Municipal Highway Agency [04]
Year built:1970
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:9,500 [as of 2008]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:45.5 tons [41.4 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:69.6
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$834,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,100 [as of 1998]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:45.5 tons [41.4 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Sufficiency rating:72.9

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,590 [as of 1989]
Truck traffic:1% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:89.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$431,000