Share:

GUINOTTE RP over MONTGALL AVE

Map 

Coordinates:
+39.11873, -94.54929
39°07'07" N, 94°32'57" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:GUINOTTE RP over MONTGALL AVE
Structure number:25388
Old structure number:U2220S026B24 (from 1992 edition)
Location:S 34 T 50 N R 33 W
Purpose:Carries highway over highway
Route classification:Collector (Urban) [17]
Length of largest span:74.2 ft. [22.6 m]
Total length:148.0 ft. [45.1 m]
Roadway width between curbs:40.4 ft. [12.3 m]
Deck width edge-to-edge:43.0 ft. [13.1 m]
Vertical clearance below bridge:13.1 ft. [4.0 m]
Owner:City or Municipal Highway Agency [04]
Year built:1990
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Prestressed concrete continuous [6]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:4,900 [as of 2009]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:66.3 tons [60.3 metric tons]
Inventory rating:61.4 tons [55.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:78.7
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$903,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:4,122 [as of 1998]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:66.3 tons [60.3 metric tons]
Inventory rating:61.4 tons [55.8 metric tons]
Sufficiency rating:80.5
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$344,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,120 [as of 1990]
Truck traffic:10% of total traffic
Deck condition:Excellent [9 out of 9]
Superstructure condition:Excellent [9 out of 9]
Substructure condition:Excellent [9 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:62.4 tons [56.7 metric tons]
Inventory rating:45.5 tons [41.4 metric tons]
Sufficiency rating:80.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$608,000