HILLCREST RD over CREEK

Map 

Coordinates:
+38.98500, -94.52000
38°59'06" N, 94°31'12" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:HILLCREST RD over CREEK
Structure number:25485
Old structure number:S131B21 048 (from 1992 edition)
Location:S 13 T 48 N R 33 W
Purpose:Carries highway over waterway
Route classification:Collector (Urban) [17]
Length of largest span:15.1 ft. [4.6 m]
Total length:40.0 ft. [12.2 m]
Roadway width between curbs:19.4 ft. [5.9 m]
Deck width edge-to-edge:22.0 ft. [6.7 m]
Owner:City or Municipal Highway Agency [04]
Year built:1906
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Number of main spans:2
Main spans material:Concrete continuous [2]
Main spans design:Culvert [19]
Deck type:Not applicable [N]
Wearing surface:Bituminous [6]

Latest Available Inspection: May 2014 

Status:Posted for load [P]
Average daily traffic:349 [as of 2014]
Truck traffic:1% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Better than present minimum criteria [7]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:36.6 tons [33.3 metric tons]
Inventory rating:21.8 tons [19.8 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:39.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$256,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
May 201439.2Structurally deficientSatisfactoryPoorPoor349
April 201239.2Structurally deficientSatisfactoryPoorPoor349
April 201037.9Structurally deficientGoodPoorFair1868
April 200837.9Structurally deficientGoodPoorFair1868
January 200637.9Structurally deficientGoodPoorFair1868
March 200437.9Structurally deficientGoodPoorFair1868
June 200237.9Structurally deficientGoodPoorFair1868
July 200037.9Structurally deficientGoodPoorFair1868
June 199837.9Structurally deficientGoodPoorFair1868
September 199034.3Structurally deficientFairSatisfactoryFair1170