Share:

RED BRIDGE RD over BLUE RVR

Map 

Coordinates:
+38.92529, -94.57121
38°55'31" N, 94°34'16" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:RED BRIDGE RD over BLUE RVR
Structure number:25519
Old structure number:U2220S176B21 (from 1992 edition)
Location:S 4 T 47 N R 33 W
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:92.9 ft. [28.3 m]
Total length:259.9 ft. [79.2 m]
Roadway width between curbs:22.0 ft. [6.7 m]
Deck width edge-to-edge:25.6 ft. [7.8 m]
Vertical clearance above deck:13.1 ft. [4.0 m]
Owner:City or Municipal Highway Agency [04]
Year built:1932
Year reconstructed:1982
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:13,200 [as of 2008]
Truck traffic:2% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:20.8 tons [18.9 metric tons]
Inventory rating:12.9 tons [11.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:1.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,681,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:8,000 [as of 1998]
Truck traffic:2% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4]
Operating rating:20.8 tons [18.9 metric tons]
Inventory rating:12.9 tons [11.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:20.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$911,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:7,870 [as of 1989]
Truck traffic:5% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:25.7 tons [23.4 metric tons]
Inventory rating:18.8 tons [17.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:39.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$703,000