PROSPECT AVE S over IS 70
Map
Coordinates:
+39.09633, -94.5515339°05'47" N, 94°33'06" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | PROSPECT AVE S over IS 70 |
| Structure number: | 259 |
| Old structure number: | A 291R 1 (from 1992 edition) |
| Location: | S 3 T 49 N R 33 W |
| Purpose: | Carries highway over highway |
| Route classification: | Minor Arterial (Urban) [16] |
| Length of largest span: | 75.1 ft. [22.9 m] |
| Total length: | 258.9 ft. [78.9 m] |
| Roadway width between curbs: | 47.9 ft. [14.6 m] |
| Deck width edge-to-edge: | 60.0 ft. [18.3 m] |
| Vertical clearance below bridge: | 14.8 ft. [4.5 m] |
| Skew angle: | 24° |
| Owner: | State Highway Agency [01] |
| Year built: | 1958 |
| Year reconstructed: | 1984 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 9 / H 10 [1] |
| Number of main spans: | 4 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Box Beam or girders - Single or Spread [06] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Integral Concrete (separate non-modified layer of concrete added to structural deck) [2] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 8,277 [as of 2009] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 61.6 tons [56.0 metric tons] |
| Inventory rating: | 14.3 tons [13.0 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 25.6 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $2,627,000 |
2000 Inspection
| Average daily traffic: | 48,700 [as of 1996] |
| Truck traffic: | 10% of total traffic |
| Evaluation: | Not applicable [N] |
| Sufficiency rating: | 80.3 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 8,630 [as of 1990] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Inventory rating: | 13.9 tons [12.6 metric tons] |
| Sufficiency rating: | 41.1 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $1,405,000 |