IS 70 W over MADISON ST, CST MADISON,

Map 

Coordinates:
+39.10694, -94.59446
39°06'25" N, 94°35'40" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:IS 70 W over MADISON ST, CST MADISON,
Structure number:344
Old structure number:A 507R1 3 (from 1992 edition)
Location:S 6 T 50 N R 34 W
Purpose:Carries highway over highway and railroad
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:128.3 ft. [39.1 m]
Total length:4336.2 ft. [1321.6 m]
Roadway width between curbs:44.9 ft. [13.7 m]
Deck width edge-to-edge:47.9 ft. [14.6 m]
Vertical clearance below bridge:24.0 ft. [7.3 m]
Skew angle:19°
Owner:State Highway Agency [01]
Year built:1960
Year reconstructed:1992
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:90
Main spans material:Prestressed concrete continuous [6]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:34,115 [as of 2009]
Truck traffic:18% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:46.2 tons [42.0 metric tons]
Inventory rating:28.6 tons [26.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:75.7
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$20,965,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:31,109 [as of 1997]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:49.5 tons [45.0 metric tons]
Inventory rating:28.7 tons [26.1 metric tons]
Sufficiency rating:80.2

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:25,989 [as of 1991]
Truck traffic:10% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:49.5 tons [45.0 metric tons]
Inventory rating:28.7 tons [26.1 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:12.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$17,978,000