US 40 E over BLUE RVR

Map 

Coordinates:
+39.06651, -94.50620
39°03'59" N, 94°30'22" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:US 40 E over BLUE RVR
Structure number:5417
Old structure number:J05262 1 (from 1992 edition)
Location:S 13 T 49 N R 33 W
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:140.8 ft. [42.9 m]
Total length:430.1 ft. [131.1 m]
Roadway width between curbs:40.0 ft. [12.2 m]
Deck width edge-to-edge:42.7 ft. [13.0 m]
Vertical clearance above deck:15.4 ft. [4.7 m]
Owner:State Highway Agency [01]
Year built:1933
Year reconstructed:1991
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Main span material:Steel [3]
Main span design:Arch - Thru [12]
Deck type:Closed Grating [4]
Wearing surface:Epoxy Overlay [5]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:7,908 [as of 2009]
Truck traffic:13% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:20.9 tons [19.0 metric tons]
Inventory rating:15.4 tons [14.0 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:11.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$5,558,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:10,720 [as of 1997]
Truck traffic:10% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:41.6 tons [37.8 metric tons]
Inventory rating:15.8 tons [14.4 metric tons]
Sufficiency rating:33.2

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:13,991 [as of 1991]
Truck traffic:10% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:28.7 tons [26.1 metric tons]
Inventory rating:10.9 tons [9.9 metric tons]
Sufficiency rating:2.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,196,000