MO 19 S over ELEVEN POINT RVR

Map 

Coordinates:
+36.79393, -91.33396
36°47'38" N, 91°20'02" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:MO 19 S over ELEVEN POINT RVR
Structure number:5778
Old structure number:K 344 1 (from 1992 edition)
Location:S 31 T 25 N R 3 W
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Rural) [06]
Length of largest span:91.2 ft. [27.8 m]
Total length:363.9 ft. [110.9 m]
Roadway width between curbs:22.0 ft. [6.7 m]
Deck width edge-to-edge:23.3 ft. [7.1 m]
Owner:State Highway Agency [01]
Year built:1934
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 13.5 / H 15 [2]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:2,264 [as of 2009]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:22.0 tons [20.0 metric tons]
Inventory rating:13.2 tons [12.0 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:32.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,269,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:912 [as of 1997]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:31.7 tons [28.8 metric tons]
Inventory rating:12.9 tons [11.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:34.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$884,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:693 [as of 1991]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:31.7 tons [28.8 metric tons]
Inventory rating:12.9 tons [11.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:37.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$849,000