Facts 

Name:BU 54 E over BAGNELL DAM
Structure number:6694
Old structure number:L1003R 1 (from 1992 edition)
Location:S 29 T 40 N R 15 W
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:55.1 ft. [16.8 m]
Total length:2583.1 ft. [787.3 m]
Roadway width between curbs:20.3 ft. [6.2 m]
Deck width edge-to-edge:25.9 ft. [7.9 m]
Vertical clearance above deck:14.8 ft. [4.5 m]
Owner:Private (other than railroad) [26]
Year built:1929
Year reconstructed:1983
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:22
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:6,547 [as of 2008]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:48.4 tons [44.0 metric tons]
Inventory rating:20.9 tons [19.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:53.0
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$10,111,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:4,660 [as of 1997]
Truck traffic:10% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:62.4 tons [56.7 metric tons]
Inventory rating:20.8 tons [18.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:22.7
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$24,100,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:4,554 [as of 1991]
Truck traffic:10% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:62.4 tons [56.7 metric tons]
Inventory rating:20.8 tons [18.9 metric tons]
Sufficiency rating:46.7
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$6,489,000