Share:

HOLLY HILLS AVE E over IS 55

Map 

Coordinates:
+38.56014, -90.25515
38°33'37" N, 90°15'19" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:HOLLY HILLS AVE E over IS 55
Structure number:870
Old structure number:A1276R 2 (from 1992 edition)
Location:S 17 T 44 N R 7 E
Purpose:Carries highway over highway
Route classification:Collector (Urban) [17]
Length of largest span:74.2 ft. [22.6 m]
Total length:230.0 ft. [70.1 m]
Roadway width between curbs:36.1 ft. [11.0 m]
Deck width edge-to-edge:47.6 ft. [14.5 m]
Vertical clearance below bridge:15.4 ft. [4.7 m]
Skew angle:25°
Owner:State Highway Agency [01]
Year built:1963
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 18 / H 20 [4]
Number of main spans:4
Main spans material:Concrete continuous [2]
Main spans design:Box Beam or girders - Single or Spread [06]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:4,062 [as of 2009]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:56.1 tons [51.0 metric tons]
Inventory rating:28.6 tons [26.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:58.7
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,603,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:51,036 [as of 1997]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:59.4 tons [54.0 metric tons]
Inventory rating:31.7 tons [28.8 metric tons]
Sufficiency rating:74.9

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:44,195 [as of 1991]
Truck traffic:10% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:59.4 tons [54.0 metric tons]
Inventory rating:31.7 tons [28.8 metric tons]
Sufficiency rating:89.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,593,000