MO 156 E over S FABIUS RVR

Map 

Coordinates:
+39.98812, -91.99139
39°59'17" N, 91°59'29" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:MO 156 E over S FABIUS RVR
Structure number:8918
Old structure number:S 952 1 (from 1992 edition)
Location:S 22 T 60 N R 10 W
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:81.0 ft. [24.7 m]
Total length:166.0 ft. [50.6 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:24.9 ft. [7.6 m]
Skew angle:37°
Owner:State Highway Agency [01]
Year built:1963
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:370 [as of 2008]
Truck traffic:25% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:16.5 tons [15.0 metric tons]
Inventory rating:8.8 tons [8.0 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:34.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$935,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:432 [as of 1997]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:18.8 tons [17.1 metric tons]
Inventory rating:8.9 tons [8.1 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:32.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$422,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:500 [as of 1991]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:18.8 tons [17.1 metric tons]
Inventory rating:8.9 tons [8.1 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:31.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$404,000