Facts 

Name:I 55 over PEARL RIVER CHANNEL
Structure number:11000550250943A
Location:1.2 MI N JCT I 55 I 20
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:129.9 ft. [39.6 m]
Total length:1032.2 ft. [314.6 m]
Roadway width between curbs:71.9 ft. [21.9 m]
Deck width edge-to-edge:74.8 ft. [22.8 m]
Owner:State Highway Agency [01]
Year built:1967
Year reconstructed:1997
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:53,000 [as of 2006]
Truck traffic:20% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:51.3 tons [46.6 metric tons]
Inventory rating:39.4 tons [35.8 metric tons]
Sufficiency rating:93.0

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:42,500 [as of 1996]
Truck traffic:13% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:51.3 tons [46.6 metric tons]
Inventory rating:39.4 tons [35.8 metric tons]
Sufficiency rating:94.0

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:29,980 [as of 1989]
Truck traffic:13% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:89.6