CLINTON BLVD over LYNCH CREEK

Map 

Coordinates:
+32.32752, -90.24611
32°19'39" N, 90°14'46" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:CLINTON BLVD over LYNCH CREEK
Structure number:11002200250027B
Location:CLINTON BLVD INTERCHANGE
Purpose:Carries highway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:18.0 ft. [5.5 m]
Total length:44.9 ft. [13.7 m]
Vertical clearance above deck:17.1 ft. [5.2 m]
Skew angle:30°
Owner:State Highway Agency [01]
Year built:1979
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Concrete [1]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,000 [as of 2006]
Truck traffic:5% of total traffic
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Culvert condition:No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inventory rating:58.4 tons [53.1 metric tons]
Sufficiency rating:83.9

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:20,320 [as of 1996]
Truck traffic:1% of total traffic
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Culvert condition:No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Inventory rating:58.4 tons [53.1 metric tons]
Sufficiency rating:82.7

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:18,480 [as of 1989]
Truck traffic:1% of total traffic
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Culvert condition:No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. [8]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:83.3