SR 25 over PEARL RIVER

Map 

Coordinates:
+32.33177, -90.13026
32°19'54" N, 90°07'49" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SR 25 over PEARL RIVER
Structure number:31000250250017A
Location:1.7 MI N I 55
Purpose:Carries highway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:120.1 ft. [36.6 m]
Total length:1180.2 ft. [359.7 m]
Roadway width between curbs:58.1 ft. [17.7 m]
Deck width edge-to-edge:60.7 ft. [18.5 m]
Owner:State Highway Agency [01]
Year built:1965
Year reconstructed:2001
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:34,500 [as of 2006]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:45.5 tons [41.4 metric tons]
Inventory rating:38.1 tons [34.6 metric tons]
Sufficiency rating:98.4
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$778,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:19,000 [as of 1996]
Truck traffic:3% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:45.5 tons [41.4 metric tons]
Inventory rating:38.1 tons [34.6 metric tons]
Sufficiency rating:76.7
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$778,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:16,440 [as of 1989]
Truck traffic:3% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:62.4 tons [56.7 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:77.4
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$778,000