Share:

ELTON ROAD over I 55

Map 

Coordinates:
+32.22136, -90.22609
32°13'17" N, 90°13'34" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:ELTON ROAD over I 55
Structure number:510005502508730
Location:ELTON RD INTERSECTION
Purpose:Carries highway over highway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:66.9 ft. [20.4 m]
Total length:229.0 ft. [69.8 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:30.2 ft. [9.2 m]
Vertical clearance below bridge:15.4 ft. [4.7 m]
Skew angle:15°
Owner:State Highway Agency [01]
Year built:1959
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Concrete continuous [2]
Main spans design:Box Beam or girders - Single or Spread [06]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:6,000 [as of 2006]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:36.0 tons [32.7 metric tons]
Inventory rating:21.8 tons [19.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:62.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$686,000

2000 Inspection 

Average daily traffic:15,000 [as of 1996]
Truck traffic:8% of total traffic
Evaluation:Not applicable [N]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:400 [as of 1989]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:79.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$232,000