PRIMOS AVE over TRIB OF LYNCH CREEK
Map
Coordinates:
+32.30866, -90.2349232°18'31" N, 90°14'06" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | PRIMOS AVE over TRIB OF LYNCH CREEK |
| Structure number: | SA2500000000122 |
| Location: | SEC 6 T 5N R 1E |
| Purpose: | Carries highway over waterway |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 24.0 ft. [7.3 m] |
| Total length: | 24.9 ft. [7.6 m] |
| Roadway width between curbs: | 29.9 ft. [9.1 m] |
| Deck width edge-to-edge: | 31.2 ft. [9.5 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1957 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 13.5 / H 15 [2] |
| Main span material: | Concrete [1] |
| Main span design: | Channel beam [22] |
| Deck type: | Concrete Precast Panels [2] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 420 [as of 2007] |
| Truck traffic: | 8% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 24.8 tons [22.5 metric tons] |
| Inventory rating: | 18.8 tons [17.1 metric tons] |
| Sufficiency rating: | 79.5 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $86,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 350 [as of 1997] |
| Truck traffic: | 8% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge with "unknown" foundation that has not been evaluated for scour. [U] |
| Operating rating: | 24.8 tons [22.5 metric tons] |
| Inventory rating: | 18.8 tons [17.1 metric tons] |
| Sufficiency rating: | 79.5 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $25,000 |