DORGAN STR over HARDY CR
Map
Coordinates:
+32.27452, -90.2446932°16'28" N, 90°14'41" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | DORGAN STR over HARDY CR |
| Structure number: | SA2500000000134 |
| Location: | SEC 13 T 5N R 1W |
| Purpose: | Carries highway over waterway |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 40.0 ft. [12.2 m] |
| Total length: | 40.0 ft. [12.2 m] |
| Roadway width between curbs: | 29.9 ft. [9.1 m] |
| Deck width edge-to-edge: | 33.1 ft. [10.1 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 2008 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Main span material: | Concrete [1] |
| Main span design: | Channel beam [22] |
| Deck type: | Concrete Precast Panels [2] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 1,500 [as of 2007] |
| Truck traffic: | 8% of total traffic |
| Deck condition: | Excellent [9 out of 9] |
| Superstructure condition: | Excellent [9 out of 9] |
| Substructure condition: | Excellent [9 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Bridge with "unknown" foundation that has not been evaluated for scour. [U] |
| Operating rating: | 47.5 tons [43.2 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 95.1 |
2000 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 1,320 [as of 1997] |
| Truck traffic: | 8% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Channel protection: | Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5] |
| Scour condition: | Bridge with "unknown" foundation that has not been evaluated for scour. [U] |
| Operating rating: | 8.9 tons [8.1 metric tons] |
| Inventory rating: | 5.9 tons [5.4 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 32.4 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $146,000 |