Share:

ROBINSON RD over CANEY CREEK

Map 

Coordinates:
+32.27128, -90.26078
32°16'17" N, 90°15'39" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:ROBINSON RD over CANEY CREEK
Structure number:SA2500000000136
Location:SEC 13 T 5N R 1W
Purpose:Carries highway over waterway
Route classification:Collector (Urban) [17]
Length of largest span:19.0 ft. [5.8 m]
Total length:57.1 ft. [17.4 m]
Roadway width between curbs:26.6 ft. [8.1 m]
Deck width edge-to-edge:27.9 ft. [8.5 m]
Skew angle:30°
Owner:City or Municipal Highway Agency [04]
Year built:1966
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Channel beam [22]
Deck type:Concrete Precast Panels [2]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:7,400 [as of 2007]
Truck traffic:8% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:24.8 tons [22.5 metric tons]
Inventory rating:18.8 tons [17.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:47.8
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$40,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:7,250 [as of 1997]
Truck traffic:8% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:24.8 tons [22.5 metric tons]
Inventory rating:18.8 tons [17.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:58.2
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$40,000