Share:

RAYMOND RD over CANEY CR

Map 

Coordinates:
+32.27579, -90.26597
32°16'33" N, 90°15'57" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:RAYMOND RD over CANEY CR
Structure number:SA2500000000139
Location:SEC 14 T 5N R 1W B
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:30.8 ft. [9.4 m]
Total length:130.9 ft. [39.9 m]
Roadway width between curbs:60.0 ft. [18.3 m]
Deck width edge-to-edge:62.7 ft. [19.1 m]
Owner:City or Municipal Highway Agency [04]
Year built:1986
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:5
Main spans material:Prestressed concrete [5]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:9,700 [as of 2007]
Truck traffic:8% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:47.5 tons [43.2 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:92.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$335,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:7,250 [as of 1997]
Truck traffic:8% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:47.5 tons [43.2 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:96.0