RAYMOND RD over BIG CREEK

Map 

Coordinates:
+32.24735, -90.31063
32°14'50" N, 90°18'38" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:RAYMOND RD over BIG CREEK
Structure number:SA2500000000152
Location:SEC 28 T 5N R 1W B
Purpose:Carries highway over waterway
Route classification:Collector (Urban) [17]
Length of largest span:30.8 ft. [9.4 m]
Total length:107.0 ft. [32.6 m]
Roadway width between curbs:30.2 ft. [9.2 m]
Deck width edge-to-edge:31.8 ft. [9.7 m]
Owner:City or Municipal Highway Agency [04]
Year built:1976
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:5
Main spans material:Concrete [1]
Main spans design:Channel beam [22]
Deck type:Concrete Precast Panels [2]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,300 [as of 2007]
Truck traffic:8% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:24.8 tons [22.5 metric tons]
Inventory rating:18.8 tons [17.1 metric tons]
Sufficiency rating:49.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$170,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,300 [as of 1997]
Truck traffic:8% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:24.8 tons [22.5 metric tons]
Inventory rating:18.8 tons [17.1 metric tons]
Sufficiency rating:58.1
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$170,000