EAGLE ST over EUBANKS CR

Map 

Coordinates:
+32.34776, -90.17080
32°20'52" N, 90°10'15" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:EAGLE ST over EUBANKS CR
Structure number:SA2500000000230
Location:SEC 23 T 6N R 1E
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Local (Urban) [19]
Length of largest span:27.9 ft. [8.5 m]
Total length:64.0 ft. [19.5 m]
Roadway width between curbs:32.2 ft. [9.8 m]
Deck width edge-to-edge:42.0 ft. [12.8 m]
Owner:City or Municipal Highway Agency [04]
Year built:1983
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:100 [as of 2007]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:24.8 tons [22.5 metric tons]
Inventory rating:18.8 tons [17.1 metric tons]
Sufficiency rating:73.3
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$60,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:180 [as of 1997]
Truck traffic:8% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:24.8 tons [22.5 metric tons]
Inventory rating:18.8 tons [17.1 metric tons]
Sufficiency rating:72.3
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$60,000