CAVALIER DR over BCH EUBANKS CR
Map
Coordinates:
+32.34062, -90.1645032°20'26" N, 90°09'52" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | CAVALIER DR over BCH EUBANKS CR |
| Structure number: | SA2500000000236 |
| Location: | SEC 26 T 6N R 1E |
| Purpose: | Carries highway over waterway |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 25.9 ft. [7.9 m] |
| Total length: | 25.9 ft. [7.9 m] |
| Roadway width between curbs: | 37.4 ft. [11.4 m] |
| Deck width edge-to-edge: | 38.1 ft. [11.6 m] |
| Skew angle: | 60° |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1991 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | M 9 / H 10 [1] |
| Main span material: | Wood or timber [7] |
| Main span design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Wood or Timber [8] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 240 [as of 2007] |
| Truck traffic: | 8% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 8.6 tons [7.8 metric tons] |
| Inventory rating: | 5.5 tons [5.0 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 38.9 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $103,000 |
2000 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 220 [as of 1997] |
| Truck traffic: | 8% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge with "unknown" foundation that has not been evaluated for scour. [U] |
| Operating rating: | 8.6 tons [7.8 metric tons] |
| Inventory rating: | 5.5 tons [5.0 metric tons] |
| Sufficiency rating: | 45.3 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $103,000 |