Share:

SOUTH DESOTO ST over RELIEF

Map 

Coordinates:
+30.35568, -88.55979
30°21'20" N, 88°33'35" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SOUTH DESOTO ST over RELIEF
Structure number:SA3000000000144
Location:SEC 5 T 8S R 6W
Purpose:Carries highway over waterway
Route classification:Collector (Urban) [17]
Length of largest span:30.8 ft. [9.4 m]
Total length:30.8 ft. [9.4 m]
Roadway width between curbs:26.6 ft. [8.1 m]
Deck width edge-to-edge:28.2 ft. [8.6 m]
Owner:City or Municipal Highway Agency [04]
Year built:1966
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Main span material:Concrete [1]
Main span design:Channel beam [22]
Deck type:Concrete Precast Panels [2]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:877 [as of 2006]
Truck traffic:15% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:24.8 tons [22.5 metric tons]
Inventory rating:18.8 tons [17.1 metric tons]
Sufficiency rating:50.3
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$222,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:877 [as of 1998]
Truck traffic:15% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:24.8 tons [22.5 metric tons]
Inventory rating:18.8 tons [17.1 metric tons]
Sufficiency rating:50.3
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$222,000