BLOSSOM HILL ROAD over ROBINSON CREEK

Map 

Coordinates:
+32.31967, -89.57040
32°19'11" N, 89°34'13" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:BLOSSOM HILL ROAD over ROBINSON CREEK
Structure number:SA6200000000041
Location:SEC 34 T 6N R 7E B
Purpose:Carries highway over waterway
Route classification:Minor Collector (Rural) [08]
Length of largest span:19.0 ft. [5.8 m]
Total length:57.1 ft. [17.4 m]
Roadway width between curbs:22.0 ft. [6.7 m]
Deck width edge-to-edge:24.6 ft. [7.5 m]
Owner:County Highway Agency [02]
Year built:1959
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: December 2014 

Status:Open, no restriction [A]
Average daily traffic:220 [as of 2013]
Truck traffic:8% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Meets minimum tolerable limits to be left in place as is [4]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Sufficiency rating:76.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$156,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
December 201476.6Not deficientSatisfactorySatisfactoryGood220
December 201276.5Not deficientGoodGoodGood220
January 201166.3Not deficientGoodGoodVery Good220
December 200966.3Not deficientGoodGoodVery Good220
January 200866.3Not deficientGoodGoodVery Good220
September 200566.3Not deficientGoodGoodVery Good170
December 200366.3Not deficientGoodGoodVery Good170
December 200166.3Not deficientGoodGoodVery Good200
December 199966.3Not deficientVery GoodVery GoodVery Good200
November 199766.3Not deficientVery GoodVery GoodVery Good200
December 199566.3Not deficientVery GoodVery GoodVery Good200