Facts 

Name:MIDWAY-ODOM ROAD over RELIEF FOR SHOCKALOO CK
Structure number:SA6200000000128
Location:SEC 20 T 8N R 8E B
Purpose:Carries highway over relief for waterway
Route classification:Local (Rural) [09]
Length of largest span:19.0 ft. [5.8 m]
Total length:76.1 ft. [23.2 m]
Roadway width between curbs:26.6 ft. [8.1 m]
Deck width edge-to-edge:27.9 ft. [8.5 m]
Owner:County Highway Agency [02]
Year built:1973
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:4
Main spans material:Concrete [1]
Main spans design:Channel beam [22]
Deck type:Concrete Precast Panels [2]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: December 2015 

Status:Open, no restriction [A]
Average daily traffic:420 [as of 2012]
Truck traffic:8% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Better than present minimum criteria [7]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:64.1 tons [58.3 metric tons]
Inventory rating:38.5 tons [35.0 metric tons]
Sufficiency rating:93.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$350,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
December 201593.7Not deficientGoodGoodGood420
December 201393.7Not deficientGoodGoodGood420
December 201173.3Not deficientGoodGoodGood320
December 200972.3Not deficientVery GoodVery GoodVery Good320
January 200872.3Not deficientVery GoodVery GoodVery Good320
October 200572.3Not deficientGoodGoodVery Good320
December 200372.3Not deficientGoodGoodVery Good320
December 200162.2Not deficientGoodGoodFair320
December 199976.3Not deficientVery GoodVery GoodSatisfactory240
November 199776.3Not deficientVery GoodVery GoodSatisfactory240
December 199576.3Not deficientVery GoodVery GoodGood240