TURKEY CREEK ROAD over TURKEY CREEK
Map
Coordinates:
+31.29689, -91.1731831°17'49" N, 91°10'23" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | TURKEY CREEK ROAD over TURKEY CREEK |
| Structure number: | SA7900000000096 |
| Location: | SEC 29 T 4N R 1W |
| Purpose: | Carries highway over waterway |
| Route classification: | Local (Rural) [09] |
| Length of largest span: | 19.0 ft. [5.8 m] |
| Total length: | 38.1 ft. [11.6 m] |
| Roadway width between curbs: | 15.1 ft. [4.6 m] |
| Deck width edge-to-edge: | 16.1 ft. [4.9 m] |
| Owner: | County Highway Agency [02] |
| Year built: | 1935 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Number of main spans: | 2 |
| Main spans material: | Wood or timber [7] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Wood or Timber [8] |
| Wearing surface: | Gravel [8] |
2010 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 50 [as of 2008] |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Bridge with "unknown" foundation that has not been evaluated for scour. [U] |
| Operating rating: | 18.0 tons [16.4 metric tons] |
| Inventory rating: | 12.4 tons [11.3 metric tons] |
| Sufficiency rating: | 40.3 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $180,000 |
2000 Inspection
| Status: | Open, posting recommended but not legally implemented [B] |
| Average daily traffic: | 50 [as of 1998] |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Bridge with "unknown" foundation that has not been evaluated for scour. [U] |
| Operating rating: | 18.0 tons [16.4 metric tons] |
| Inventory rating: | 12.4 tons [11.3 metric tons] |
| Sufficiency rating: | 41.3 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $99,000 |