SR1172 over CREEK

Map 

Coordinates:
+35.27780, -81.69974
35°16'40" N, 81°41'59" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SR1172 over CREEK
Structure number:000000000450131
Location:0.3 MI. N. JCT. SR1180
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:30.8 ft. [9.4 m]
Total length:30.8 ft. [9.4 m]
Roadway width between curbs:19.7 ft. [6.0 m]
Deck width edge-to-edge:20.0 ft. [6.1 m]
Owner:State Highway Agency [01]
Year built:1953
Year reconstructed:1987
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Wood or Timber [8]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:470 [as of 2005]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:97.0 tons [88.2 metric tons]
Inventory rating:58.4 tons [53.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:77.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$170,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:470 [as of 1997]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:94.1 tons [85.5 metric tons]
Inventory rating:56.4 tons [51.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:77.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$171,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:300 [as of 1989]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:73.3 tons [66.6 metric tons]
Inventory rating:49.5 tons [45.0 metric tons]
Sufficiency rating:78.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$148,000