US29 over SEABOARD COASTLINE RR
Map
Coordinates:
+35.23674, -80.8384835°14'12" N, 80°50'19" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | US29 over SEABOARD COASTLINE RR |
| Structure number: | 000000001190101 |
| Location: | 0.15 MI. N. JCT. I277 |
| Purpose: | Carries highway and pedestrian walkway over railroad |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 62.0 ft. [18.9 m] |
| Total length: | 136.2 ft. [41.5 m] |
| Roadway width between curbs: | 76.1 ft. [23.2 m] |
| Deck width edge-to-edge: | 88.6 ft. [27.0 m] |
| Vertical clearance below bridge: | 23.3 ft. [7.1 m] |
| Skew angle: | 31° |
| Owner: | State Highway Agency [01] |
| Year built: | 1994 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18+Mod / HS 20+Mod [6] |
| Number of main spans: | 3 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 30,000 [as of 2004] |
| Truck traffic: | 12% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 81.2 tons [73.8 metric tons] |
| Inventory rating: | 48.5 tons [44.1 metric tons] |
| Sufficiency rating: | 100.0 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 22,800 [as of 1996] |
| Truck traffic: | 12% of total traffic |
| Deck condition: | Excellent [9 out of 9] |
| Superstructure condition: | Excellent [9 out of 9] |
| Substructure condition: | Excellent [9 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 80.2 tons [72.9 metric tons] |
| Inventory rating: | 47.5 tons [43.2 metric tons] |
| Sufficiency rating: | 100.0 |
1992 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 17,000 [as of 1988] |
| Truck traffic: | 12% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 35.6 tons [32.4 metric tons] |
| Inventory rating: | 18.8 tons [17.1 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 46.5 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $340,000 |