Share:

SR4873 over LITTLE SUGAR CREEK

Map 

Coordinates:
+35.21377, -80.83583
35°12'50" N, 80°50'09" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SR4873 over LITTLE SUGAR CREEK
Structure number:000000001190164
Location:0.13 MI.W.JCT.SR3816
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Local (Urban) [19]
Length of largest span:35.1 ft. [10.7 m]
Total length:105.0 ft. [32.0 m]
Roadway width between curbs:67.9 ft. [20.7 m]
Deck width edge-to-edge:82.4 ft. [25.1 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:1948
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 13.5 / HS 15 [3]
Number of main spans:3
Main spans material:Concrete [1]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:15,900 [as of 1990]
Truck traffic:7% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:45.5 tons [41.4 metric tons]
Inventory rating:27.7 tons [25.2 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:70.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,140,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:15,900 [as of 1990]
Truck traffic:7% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:45.5 tons [41.4 metric tons]
Inventory rating:27.7 tons [25.2 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:70.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$870,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:18,500 [as of 1988]
Truck traffic:12% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:44.6 tons [40.5 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:69.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$711,000