Share:

ROZZELLS FERRY RD. over I85

Map 

Coordinates:
+35.26098, -80.88010
35°15'40" N, 80°52'48" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:ROZZELLS FERRY RD. over I85
Structure number:000000001190216
Location:0.17 MI. S. JCT. NC16
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:82.0 ft. [25.0 m]
Total length:386.2 ft. [117.7 m]
Roadway width between curbs:27.9 ft. [8.5 m]
Deck width edge-to-edge:34.8 ft. [10.6 m]
Vertical clearance below bridge:17.1 ft. [5.2 m]
Skew angle:99°
Owner:State Highway Agency [01]
Year built:1991
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:6
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,200 [as of 1990]
Truck traffic:7% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:66.3 tons [60.3 metric tons]
Inventory rating:39.6 tons [36.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:79.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,718,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,200 [as of 1990]
Truck traffic:7% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:80.2 tons [72.9 metric tons]
Inventory rating:47.5 tons [43.2 metric tons]
Sufficiency rating:82.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,285,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,300 [as of 1988]
Truck traffic:7% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:45.5 tons [41.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:77.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$530,000