QUAIL HOLLOW RD. over MCMULLEN CREEK
Map
Coordinates:
+35.11720, -80.8287335°07'02" N, 80°49'43" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | QUAIL HOLLOW RD. over MCMULLEN CREEK |
| Structure number: | 000000001190240 |
| Location: | 0.2MI.N.JCT.CARMEL RD. |
| Purpose: | Carries highway and pedestrian walkway over waterway |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 46.9 ft. [14.3 m] |
| Total length: | 149.9 ft. [45.7 m] |
| Roadway width between curbs: | 52.2 ft. [15.9 m] |
| Deck width edge-to-edge: | 63.7 ft. [19.4 m] |
| Skew angle: | 30° |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1965 |
| Year reconstructed: | 1991 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Number of main spans: | 3 |
| Main spans material: | Prestressed concrete [5] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 14,100 [as of 1990] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge with "unknown" foundation that has not been evaluated for scour. [U] |
| Operating rating: | 33.7 tons [30.6 metric tons] |
| Inventory rating: | 26.7 tons [24.3 metric tons] |
| Sufficiency rating: | 75.5 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 14,100 [as of 1990] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 81.2 tons [73.8 metric tons] |
| Inventory rating: | 49.5 tons [45.0 metric tons] |
| Sufficiency rating: | 83.0 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 10,800 [as of 1988] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 33.7 tons [30.6 metric tons] |
| Inventory rating: | 26.7 tons [24.3 metric tons] |
| Sufficiency rating: | 75.5 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $522,000 |