Share:

MATHESON AVE. over SOU.RR,BREVARD ST.

Map 

Coordinates:
+35.24493, -80.81243
35°14'42" N, 80°48'45" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:MATHESON AVE. over SOU.RR,BREVARD ST.
Structure number:000000001190255
Location:0.2MI.S.JCT.N.TRYON ST.
Purpose:Carries highway and pedestrian walkway over highway and railroad
Route classification:Minor Arterial (Urban) [16]
Length of largest span:89.9 ft. [27.4 m]
Total length:761.2 ft. [232.0 m]
Roadway width between curbs:47.9 ft. [14.6 m]
Deck width edge-to-edge:57.4 ft. [17.5 m]
Vertical clearance below bridge:24.3 ft. [7.4 m]
Skew angle:
Owner:City or Municipal Highway Agency [04]
Year built:1969
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:11
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,000 [as of 1991]
Truck traffic:7% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:78.2 tons [71.1 metric tons]
Inventory rating:45.5 tons [41.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:76.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$4,727,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,000 [as of 1991]
Truck traffic:7% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:76.2 tons [69.3 metric tons]
Inventory rating:45.5 tons [41.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:78.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,447,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,000 [as of 1990]
Truck traffic:7% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:58.4 tons [53.1 metric tons]
Inventory rating:29.7 tons [27.0 metric tons]
Sufficiency rating:76.6