Share:

BEATTIES FORD ROAD over NC16 & SCL.RR

Map 

Coordinates:
+35.24979, -80.85646
35°14'59" N, 80°51'23" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:BEATTIES FORD ROAD over NC16 & SCL.RR
Structure number:000000001190348
Location:0.5 MI. N. JCT. I77
Purpose:Carries highway and pedestrian walkway over highway and railroad
Route classification:Minor Arterial (Urban) [16]
Length of largest span:101.1 ft. [30.8 m]
Total length:356.0 ft. [108.5 m]
Roadway width between curbs:51.8 ft. [15.8 m]
Deck width edge-to-edge:64.6 ft. [19.7 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Skew angle:40°
Owner:State Highway Agency [01]
Year built:1972
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:5
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:20,000 [as of 2006]
Truck traffic:6% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:69.3 tons [63.0 metric tons]
Inventory rating:41.6 tons [37.8 metric tons]
Sufficiency rating:77.6

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:18,150 [as of 1997]
Truck traffic:6% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:67.3 tons [61.2 metric tons]
Inventory rating:40.6 tons [36.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:74.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,851,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:15,300 [as of 1990]
Truck traffic:12% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:62.4 tons [56.7 metric tons]
Inventory rating:33.7 tons [30.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:74.7