Share:

BRIAR CREEK ROAD over EDWARDS BRANCH

Map 

Coordinates:
+35.20648, -80.80041
35°12'23" N, 80°48'01" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:BRIAR CREEK ROAD over EDWARDS BRANCH
Structure number:000000001190428
Location:0.2 MI N JCT 7TH STREET
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Local (Urban) [19]
Length of largest span:40.0 ft. [12.2 m]
Total length:42.0 ft. [12.8 m]
Roadway width between curbs:44.9 ft. [13.7 m]
Deck width edge-to-edge:57.1 ft. [17.4 m]
Skew angle:20°
Owner:City or Municipal Highway Agency [04]
Year built:1950
Year reconstructed:1965
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 9 / H 10 [1]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:2,500 [as of 1994]
Truck traffic:7% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:26.7 tons [24.3 metric tons]
Inventory rating:15.8 tons [14.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:50.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$405,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:2,500 [as of 1994]
Truck traffic:7% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:22.8 tons [20.7 metric tons]
Inventory rating:11.9 tons [10.8 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:43.7
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$340,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:7,000 [as of 1988]
Truck traffic:7% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:20.8 tons [18.9 metric tons]
Inventory rating:9.9 tons [9.0 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:37.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$284,000