HOVIS ROAD over CSX RR
Map
Coordinates:
+35.27245, -80.8983235°16'21" N, 80°53'54" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | HOVIS ROAD over CSX RR |
| Structure number: | 000000001190441 |
| Location: | 0.3 MI.S.JCT.ROZZELLES RD |
| Purpose: | Carries highway and pedestrian walkway over railroad |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 54.1 ft. [16.5 m] |
| Total length: | 144.0 ft. [43.9 m] |
| Roadway width between curbs: | 27.9 ft. [8.5 m] |
| Deck width edge-to-edge: | 36.1 ft. [11.0 m] |
| Vertical clearance below bridge: | 21.0 ft. [6.4 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1957 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Number of main spans: | 3 |
| Main spans material: | Steel [3] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 10,000 [as of 1994] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 36.6 tons [33.3 metric tons] |
| Inventory rating: | 20.8 tons [18.9 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 55.3 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $641,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 10,000 [as of 1994] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 42.6 tons [38.7 metric tons] |
| Inventory rating: | 24.8 tons [22.5 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 62.6 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $511,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 9,000 [as of 1988] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 45.5 tons [41.4 metric tons] |
| Inventory rating: | 27.7 tons [25.2 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 68.8 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $422,000 |