Share:

ND HIGHWAY 54 over RED RIVER OF THE NORTH

Map 

Coordinates:
+48.19452, -97.14153
48°11'40" N, 97°08'29" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:ND HIGHWAY 54 over RED RIVER OF THE NORTH
Structure number:0054009958
Location:MINNESOTA BORDER
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Rural) [06]
Length of largest span:214.9 ft. [65.5 m]
Total length:792.0 ft. [241.4 m]
Roadway width between curbs:29.9 ft. [9.1 m]
Deck width edge-to-edge:33.1 ft. [10.1 m]
Vertical clearance above deck:16.4 ft. [5.0 m]
Owner:State Highway Agency [01]
Year built:1959
Year reconstructed:2008
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,500 [as of 2010]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:58.4 tons [53.1 metric tons]
Inventory rating:29.7 tons [27.0 metric tons]
Sufficiency rating:76.1
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,525,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,300 [as of 1998]
Truck traffic:11% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:58.4 tons [53.1 metric tons]
Inventory rating:29.7 tons [27.0 metric tons]
Sufficiency rating:72.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,525,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,100 [as of 1990]
Truck traffic:23% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:43.3 tons [39.4 metric tons]
Inventory rating:22.3 tons [20.3 metric tons]
Sufficiency rating:71.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,019,000