Share:

TOWNSHIP ROAD over S CH PLATTE RIVER

Map 

Coordinates:
+41.38457, -97.33503
41°23'04" N, 97°20'06" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:TOWNSHIP ROAD over S CH PLATTE RIVER
Structure number:C001200305P
Location:2.8N 4.8W BELLWOOD
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:18.0 ft. [5.5 m]
Total length:73.2 ft. [22.3 m]
Roadway width between curbs:15.7 ft. [4.8 m]
Deck width edge-to-edge:16.1 ft. [4.9 m]
Vertical clearance above deck:11.8 ft. [3.6 m]
Owner:County Highway Agency [02]
Year built:1891
Year reconstructed:1928
Historic significance:Bridge is on the National Register of Historic Places [1]
Number of main spans:4
Main spans material:Wood or timber [7]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Wood or Timber [8]
Wearing surface:Wood or Timber [7]

2010 Inspection 

Status:Bridge closed to all traffic [K]
Average daily traffic:15 [as of 2003]
Deck condition:Fair [5 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Serious [3 out of 9]
Channel protection:Bank protection has failed. River control devices have been destroyed. Stream bed aggradation, degradation or lateral movement has changed the channel to now threaten the bridge and/or approach roadway. [3]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Evaluation:Structurally deficient [1]
Sufficiency rating:14.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$240,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:15 [as of 1997]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:15.8 tons [14.4 metric tons]
Inventory rating:7.9 tons [7.2 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:22.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$176,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:15 [as of 1990]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:15.8 tons [14.4 metric tons]
Inventory rating:8.7 tons [7.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:20.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$75,000