TOWNSHIP ROAD over STREAM

Map 

Coordinates:
+42.50471, -98.12348
42°30'17" N, 98°07'25" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:TOWNSHIP ROAD over STREAM
Structure number:C005401905P
Location:8.1W .4S OF WINNETOON
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:70.9 ft. [21.6 m]
Total length:71.9 ft. [21.9 m]
Roadway width between curbs:15.7 ft. [4.8 m]
Deck width edge-to-edge:15.7 ft. [4.8 m]
Owner:County Highway Agency [02]
Year built:1946
Year reconstructed:1965
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Main span material:Steel [3]
Main span design:Truss - Deck [09]
Deck type:Wood or Timber [8]
Wearing surface:Wood or Timber [7]

2010 Inspection 

Status:Bridge closed to all traffic [K]
Average daily traffic:15 [as of 2003]
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Evaluation:Structurally deficient [1]
Sufficiency rating:29.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$237,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:15 [as of 1997]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:8.9 tons [8.1 metric tons]
Inventory rating:5.0 tons [4.5 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:37.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$173,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:15 [as of 1990]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:9.5 tons [8.6 metric tons]
Inventory rating:5.0 tons [4.5 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:40.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$134,000