COLL 7762 over OTOE CREEK

Map 

Coordinates:
+41.33584, -96.50026
41°20'09" N, 96°30'01" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:COLL 7762 over OTOE CREEK
Structure number:C007821625
Location:.5N 3.7W OF LESHARA
Purpose:Carries highway over waterway
Route classification:Minor Collector (Rural) [08]
Length of largest span:100.1 ft. [30.5 m]
Total length:140.1 ft. [42.7 m]
Roadway width between curbs:20.3 ft. [6.2 m]
Deck width edge-to-edge:20.3 ft. [6.2 m]
Owner:County Highway Agency [02]
Year built:1925
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, posting recommended but not legally implemented [B]
Average daily traffic:37 [as of 1998]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:17.8 tons [16.2 metric tons]
Inventory rating:10.9 tons [9.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:50.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$460,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:37 [as of 1999]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:25.7 tons [23.4 metric tons]
Inventory rating:14.9 tons [13.5 metric tons]
Sufficiency rating:60.2

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:37 [as of 1990]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:26.6 tons [24.2 metric tons]
Inventory rating:14.9 tons [13.5 metric tons]
Sufficiency rating:67.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$168,000