Share:

COUNTY HIGHWAY over TRIB TO ELKHORN RIV

Map 

Coordinates:
+42.00385, -97.33362
42°00'14" N, 97°20'01" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:COUNTY HIGHWAY over TRIB TO ELKHORN RIV
Structure number:C008401405
Location:5.1W 4N OF STANTON
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:12.1 ft. [3.7 m]
Total length:25.9 ft. [7.9 m]
Skew angle:15°
Owner:County Highway Agency [02]
Year built:2007
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Concrete [1]
Main spans design:Culvert [19]
Deck type:Not applicable [N]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:30 [as of 2003]
Channel protection:There are no noticeable or noteworthy deficiencies which affect the condition of the channel. [9]
Pier/abutment protection:Navigation protection not required [1]
Culvert condition:No deficiencies [9]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:23.8 tons [21.6 metric tons]
Sufficiency rating:88.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$113,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:30 [as of 1997]
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:32.7 tons [29.7 metric tons]
Inventory rating:22.8 tons [20.7 metric tons]
Sufficiency rating:57.2

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:30 [as of 1990]
Deck condition:Good [7 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:45.0 tons [40.9 metric tons]
Inventory rating:22.3 tons [20.3 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:50.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$83,000