Facts 

Name:N51 over MISSOURI RIVER/CITY ST
Structure number:S051 03644
Location:1E DECATUR
Purpose:Carries highway over highway and waterway
Route classification:Minor Arterial (Rural) [06]
Tolls:Yes [1]
Length of largest span:420.0 ft. [128.0 m]
Total length:1956.1 ft. [596.2 m]
Roadway width between curbs:22.6 ft. [6.9 m]
Deck width edge-to-edge:24.0 ft. [7.3 m]
Vertical clearance above deck:18.7 ft. [5.7 m]
Vertical clearance below bridge:65.9 ft. [20.1 m]
Owner:Private (other than railroad) [26]
Year built:1950
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Truss - Thru [10]
Deck type:Open Grating [3]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,925 [as of 2008]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:26.7 tons [24.3 metric tons]
Inventory rating:15.8 tons [14.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:31.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$8,038,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,745 [as of 1998]
Truck traffic:10% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:17.8 tons [16.2 metric tons]
Inventory rating:17.8 tons [16.2 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:50.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$5,894,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,465 [as of 1990]
Truck traffic:9% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:18.6 tons [16.9 metric tons]
Inventory rating:18.6 tons [16.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:51.1
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$4,198,000