Share:

SB-STORZ EXP over NB-US75

Map 

Coordinates:
+41.30166, -95.95236
41°18'06" N, 95°57'08" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SB-STORZ EXP over NB-US75
Structure number:S075 09341
Location:AMES AVE/STORZ EXP INTCHG
Purpose:Carries highway overpass over highway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:83.0 ft. [25.3 m]
Total length:191.0 ft. [58.2 m]
Roadway width between curbs:27.9 ft. [8.5 m]
Deck width edge-to-edge:30.2 ft. [9.2 m]
Vertical clearance below bridge:17.1 ft. [5.2 m]
Skew angle:48°
Owner:State Highway Agency [01]
Year built:1986
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,418 [as of 2006]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:73.3 tons [66.6 metric tons]
Inventory rating:43.6 tons [39.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:80.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$784,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:9,550 [as of 1998]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:79.8
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$2,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:6,000 [as of 1990]
Truck traffic:10% of total traffic
Deck condition:Excellent [9 out of 9]
Superstructure condition:Excellent [9 out of 9]
Substructure condition:Excellent [9 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:80.4