Share:

SB-I480 over I80/RAMP 4

Map 

Coordinates:
+41.22881, -95.95540
41°13'44" N, 95°57'19" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SB-I480 over I80/RAMP 4
Structure number:S080 45303A
Location:GROVER ST INTRCHG #3
Purpose:Carries highway overpass over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:252.0 ft. [76.8 m]
Total length:1538.1 ft. [468.8 m]
Roadway width between curbs:75.1 ft. [22.9 m]
Deck width edge-to-edge:77.4 ft. [23.6 m]
Vertical clearance above deck:16.4 ft. [5.0 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Owner:State Highway Agency [01]
Year built:1989
Year reconstructed:2007
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:10
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:44,370 [as of 2002]
Truck traffic:7% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:31.7 tons [28.8 metric tons]
Inventory rating:18.8 tons [17.1 metric tons]
Sufficiency rating:54.5
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$6,321,000

2000 Inspection 

Average daily traffic:3,900 [as of 1998]
Truck traffic:14% of total traffic
Evaluation:Not applicable [N]

1992 Inspection 

Status:New structure not yet open to traffic [G]
Average daily traffic:25,800 [as of 1990]
Truck traffic:4% of total traffic
Deck condition:Excellent [9 out of 9]
Superstructure condition:Excellent [9 out of 9]
Substructure condition:Excellent [9 out of 9]
Channel protection:There are no noticeable or noteworthy deficiencies which affect the condition of the channel. [9]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:73.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]