Share:

WB-I80 over WB-I80 TO SB-US75 RMP 4

Map 

Coordinates:
+41.22333, -95.95167
41°13'24" N, 95°57'06" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:WB-I80 over WB-I80 TO SB-US75 RMP 4
Structure number:S080 45314L
Location:GROVER ST INTRCHG #9
Purpose:Carries highway overpass over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:107.9 ft. [32.9 m]
Total length:257.9 ft. [78.6 m]
Roadway width between curbs:45.9 ft. [14.0 m]
Deck width edge-to-edge:48.6 ft. [14.8 m]
Vertical clearance below bridge:21.0 ft. [6.4 m]
Skew angle:46°
Owner:State Highway Agency [01]
Year built:1990
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:43,000 [as of 2008]
Truck traffic:12% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Excellent [9 out of 9]
Substructure condition:Excellent [9 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:82.2 tons [74.7 metric tons]
Inventory rating:49.5 tons [45.0 metric tons]
Sufficiency rating:98.0

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:29,440 [as of 1998]
Truck traffic:14% of total traffic
Deck condition:Excellent [9 out of 9]
Superstructure condition:Excellent [9 out of 9]
Substructure condition:Excellent [9 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:98.0

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:23,250 [as of 1990]
Truck traffic:14% of total traffic
Deck condition:Excellent [9 out of 9]
Superstructure condition:Excellent [9 out of 9]
Substructure condition:Excellent [9 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:96.0