Share:

US275/N92 over BNSF RR 074-715-B

Map 

Coordinates:
+41.21251, -95.96941
41°12'45" N, 95°58'10" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:US275/N92 over BNSF RR 074-715-B
Structure number:S275 18809
Location:36TH & L STREET OMAHA
Purpose:Carries highway over railroad
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:67.9 ft. [20.7 m]
Total length:631.9 ft. [192.6 m]
Roadway width between curbs:51.8 ft. [15.8 m]
Deck width edge-to-edge:54.5 ft. [16.6 m]
Vertical clearance below bridge:23.3 ft. [7.1 m]
Skew angle:11°
Owner:State Highway Agency [01]
Year built:1939
Year reconstructed:1977
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 18 / H 20 [4]
Number of main spans:10
Main spans material:Steel [3]
Main spans design:Girder and floorbeam system [03]
Deck type:Other [9]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:19,665 [as of 2008]
Truck traffic:6% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:32.7 tons [29.7 metric tons]
Inventory rating:19.8 tons [18.0 metric tons]
Sufficiency rating:57.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$1,905,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:25,625 [as of 1998]
Truck traffic:6% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:25.7 tons [23.4 metric tons]
Inventory rating:14.9 tons [13.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:46.8
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$1,905,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:30,800 [as of 1990]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:25.7 tons [23.4 metric tons]
Sufficiency rating:55.1