WOOLWORTH AVE/FAU over I480/US75

Map 

Coordinates:
+41.24526, -95.95343
41°14'43" N, 95°57'12" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:WOOLWORTH AVE/FAU over I480/US75
Structure number:S480 00131
Location:IN OMAHA
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Collector (Urban) [17]
Length of largest span:74.2 ft. [22.6 m]
Total length:240.2 ft. [73.2 m]
Roadway width between curbs:27.9 ft. [8.5 m]
Deck width edge-to-edge:42.3 ft. [12.9 m]
Vertical clearance below bridge:13.8 ft. [4.2 m]
Owner:State Highway Agency [01]
Year built:1962
Year reconstructed:1998
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,200 [as of 2006]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Good [7 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:77.2 tons [70.2 metric tons]
Inventory rating:46.5 tons [42.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:72.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$987,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,800 [as of 1998]
Deck condition:Excellent [9 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:48.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$723,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,300 [as of 1990]
Truck traffic:10% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:48.4
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$954,000