Facts 

Name:EB-I480 over 20TH THRU 16TH/FAU 5095
Structure number:S480 00310R
Location:IN OMAHA
Purpose:Carries highway overpass over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:129.9 ft. [39.6 m]
Total length:1581.1 ft. [481.9 m]
Roadway width between curbs:55.4 ft. [16.9 m]
Deck width edge-to-edge:58.1 ft. [17.7 m]
Vertical clearance below bridge:19.0 ft. [5.8 m]
Owner:State Highway Agency [01]
Year built:1970
Year reconstructed:1999
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:13
Main spans material:Steel continuous [4]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:21,838 [as of 2008]
Truck traffic:3% of total traffic
Deck condition:Excellent [9 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:66.3 tons [60.3 metric tons]
Inventory rating:32.7 tons [29.7 metric tons]
Sufficiency rating:77.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$4,761,000

2000 Inspection 

Average daily traffic:1,975 [as of 1998]
Evaluation:Not applicable [N]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:14,560 [as of 1990]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:26.7 tons [24.3 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:39.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$6,282,000