Share:

NB-I680 BRG#6 over I80/SBCD-E/RP10-11 WBCD

Map 

Coordinates:
+41.22415, -96.08599
41°13'27" N, 96°05'10" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:NB-I680 BRG#6 over I80/SBCD-E/RP10-11 WBCD
Structure number:S680 00017R
Location:I80/I680 INTRCHG
Purpose:Carries highway overpass over highway
Route classification:Principal Arterial - Interstate (Rural) [01]
Length of largest span:159.1 ft. [48.5 m]
Total length:1140.1 ft. [347.5 m]
Roadway width between curbs:62.0 ft. [18.9 m]
Deck width edge-to-edge:64.6 ft. [19.7 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Skew angle:55°
Owner:State Highway Agency [01]
Year built:1994
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 22.5 / HS 25 [9]
Number of main spans:9
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:70,090 [as of 2008]
Truck traffic:4% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Excellent [9 out of 9]
Substructure condition:Good [7 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:91.1 tons [82.8 metric tons]
Inventory rating:54.5 tons [49.5 metric tons]
Sufficiency rating:94.0

2000 Inspection 

Average daily traffic:51,815 [as of 1998]
Truck traffic:10% of total traffic
Evaluation:Not applicable [N]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:34,877 [as of 1990]
Truck traffic:4% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:28.7 tons [26.1 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:46.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$870,000