NB-I680 BRG#6 over I80/SBCD-E/RP10-11 WBCD
Map
Coordinates:
+41.22415, -96.0859941°13'27" N, 96°05'10" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | NB-I680 BRG#6 over I80/SBCD-E/RP10-11 WBCD |
| Structure number: | S680 00017R |
| Location: | I80/I680 INTRCHG |
| Purpose: | Carries highway overpass over highway |
| Route classification: | Principal Arterial - Interstate (Rural) [01] |
| Length of largest span: | 159.1 ft. [48.5 m] |
| Total length: | 1140.1 ft. [347.5 m] |
| Roadway width between curbs: | 62.0 ft. [18.9 m] |
| Deck width edge-to-edge: | 64.6 ft. [19.7 m] |
| Vertical clearance below bridge: | 16.4 ft. [5.0 m] |
| Skew angle: | 55° |
| Owner: | State Highway Agency [01] |
| Year built: | 1994 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 22.5 / HS 25 [9] |
| Number of main spans: | 9 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 70,090 [as of 2008] |
| Truck traffic: | 4% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Excellent [9 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 91.1 tons [82.8 metric tons] |
| Inventory rating: | 54.5 tons [49.5 metric tons] |
| Sufficiency rating: | 94.0 |
2000 Inspection
| Average daily traffic: | 51,815 [as of 1998] |
| Truck traffic: | 10% of total traffic |
| Evaluation: | Not applicable [N] |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 34,877 [as of 1990] |
| Truck traffic: | 4% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Poor [4 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 35.6 tons [32.4 metric tons] |
| Inventory rating: | 28.7 tons [26.1 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 46.9 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $870,000 |